The ever expanding bureaucratic nightmare that is The Governor’s Office of Storm Recovery (GOSR), aka NY Rising, is using their power to randomly change the rules and grant awards as they see fit with no warning. The latest incarnation of this is the secret changing of grant awards by reducing the price of at least one item and then recalculating and reducing the award. By modifying and reducing grant awards the Governor’s Office of Storm Recovery has put homeowners in difficult financial positions. Grant recipients are relying on the documents they receive from NY Rising and when they are unexpectedly changed, usually at the end of the project, big financial problems are created.
In the real world, if we had a basic contract, we would be able to bring the situation to court and because they (NY Rising) created a situation of detrimental reliance we could force them to make good on their promise (in this case the grant award). The website USLegal.com defines Detrimental Reliance this way, “Detrimental reliance is a term commonly used to force another to perform their obligations under a contract, using the theory of promissory estoppel. ... Relying on the promise was reasonable or foreseeable. There was actual and reasonable reliance on the promise.” We relied on the grant award computations, we relied on the process by which they were calculated and we took the signing of a grant award as a promise from NY Rising to provide the funding.
The cornerstone of NY Rising’s repair and elevation program has been a form that architects fill out called the “6100 form”. This form is a spreadsheet with each of the tasks or materials required to repair or elevate a home listed and the required quantity identified. Each home is different and each form has different quantities of materials or tasks that will be needed. NY Rising specifically instructs grant recipients that they should not enter into negotiations with general contractors until the 6100 has been completed . The idea is to make sure that the homeowner can negotiate with confidence the best possible contract to get the work completed. We are actually relying on the promise of the amount of the grant to enter into a contract!
• NY Rising Infographic – step 4b engage architect prior to hiring a contractor
• NY Rising document "Request for Scope of Work Change Itemization from – 6100 Completion guide" dated 8/22/2014– “you should use the permit documents and Form 6100 for pricing and contract negotiations in order to engage a general contractor"
• NY Rising document "Home Elevation Design Guidance" dated July 29, 2014 "Once complete, the Permit Documents and Final Form 6100 should be used to engage a general contractor for pricing and contract negotiations"
After construction has completed, the architect can resubmit a 6100 form to include items that were missed, like pile extensions and damage from the lift such as cracked sheetrock. It’s during this process that NY Rising is revising the pricing on one of the items, NY Rising item, Helical Pile – up to 25’. Any grants that were calculated using the original helical pile pricing are triggering a reduction in the total award. The end result is a lower grant even after the additional items were added into the 6100. Because the homeowner relied on the 6100 to negotiate a contract to complete the repairs, as per NY Rising guidance, the homeowner will have insufficient funds to cover not only the original work but also the new work that caused the 6100 to be resubmitted.
When asked about this, Lisa Bova-Hiatt, Executive Director, Governor’s Office of Storm Recovery, she said “This price reduction was due to the original price being significantly higher than market price. As you can imagine, as distributors of public funds, we can’t justify distributing more than the market charges for an item.”
What she neglected to say that NY Rising actually did their own research on the pricing for those piles and in many cases the work was actually done and paid for in 2014. It is my understanding that early in the recovery process Xactimate (the estimating program used by NY Rising) only had pricing data for driven piles not helical piles. I have been told that the pricing for helical piles was collected by NY Rising after interviews with companies doing this type of work on Long Island. Up until very recently this type of pile was not very common on Long Island and few contractors were actually doing this type of work so the pricing for the piles would have been more expensive at the beginning of the recovery. There are now hundreds of companies installing helical piles and it is not surprising that the cost has come down. New piles should be priced accordingly.
Homeowners entering into legally binding contracts based on signed grant agreements from NY Rising need to be protected. Currently, if a homeowner has their grant reduced because of submitting a revised 6100 the only recourse is to request that the revised 6100 form be rejected and the original 6100 be used. This has the effect of creating unmet needs that they Sandy family may have difficulty filling and a two tiered pricing structure for what Lisa Bova-Hiatt claims the program can’t justify.
This is another clear example of why Sandy families need a bill of rights. We have been reliant on a pseudo governmental agency that time and time again has acted spitefully, without consideration for their actions all the while hiding behind the Stafford Act and HUD. Reliance on The Governor’s Office of Storm Recovery is really becoming detrimental for Long Island families.

I have been saying this for a long time since they changed to paying only 20% foundation walls instead of the whole thing. I'm still not home and don't have enough money to repair. Is their any way we can file a class action suit?
ReplyDeleteIf NYRising can lower their award for helical piles, why can't they increase their award for everything else that is woefully too low?
ReplyDeleteNYRising claims should be "reopened" and audited ust like FEMA was forced to reopen flood claims.
ReplyDeleteNYRising is not providing all homeowners with what they are entitled to under the program.
The "insiders" are getting large awards ($250K+) whereas the general public are getting small awards ($120K-) for the same size project.
They do this by telling some architects what xactimate wording to put into their 6100's to get the largest awards, and going out of their way to NOT provide the same information to other architects.
Has someone found an Answer yet? I'm in Upstate NY, and have been going back, and forth with NY Rising Classifying my house without warrant, and now they are trying to force me into a contract that they will give me a single story mobile home, for my Now 2 story 9room, 3bathroom House? They are Consistently breaking their Own Guidelines, and now seems like persecuting me because I Proved substantial damage, that would be a Demo/Rebuild, then they reclassified it as a Mobile home, and That's what they have changed my contract to. Any Suggestions> Isn't there some kind of law out there against this? Its a Contract Right?
ReplyDelete